top of page
Construction & Surfacing Contractors
Construction & Surfacing Contractors
Company Message
De-silting of the Brent river for Ealing Council Ranger Team
De-silting of the Brent river for Ealing Council Ranger Team
This project was awarded to us to clear the build up of silt from the Brent River running through Perivale, the build up of silt was so bad that there was only about 2" of flowing water, this was causing major problems to a nearby golf course during periods of wet weather when the banks would overflow, our contract was to remove approximately 800 tonnes and level out on site within one week
1/1
bottom of page